Preparation For Winter; Winter Lay-Up - Vetus EP2200 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53

Preparation for winter

VD00171
Cooling System
In order to prevent frost damage to the
water filter in winter, either drain the water
or fill the installation with anti-freeze.
To drain out the water, remove the hose
connections, the filter housing does not
have a drain tap.
When filling with anti-freeze, take care that
it does not spill into the waterway. Anti-
freeze is poisonous!
If the boat is laid up ashore at the end of
the season, the water can be simply
drained off by allowing the motor to run for
a short period with the sea cock(s) open.

Winter Lay-up

VD00139
CT40063
The electrical system
Disconnect the battery cables.
Charging the batteries
Charge the batteries, as necessary, regu-
larly throughout the winter period!
3
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ep2200h

Table des Matières