On-Site Installation - Panasonic TY-CE85PS12 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54

On-site installation

Installation work must be carried out only
by a qualified technician.
Be absolutely sure to install the ceiling-
hanging bracket using at least four wire
ropes so that it will be able to support the
weight.
To ensure that persons in the immediate
vicinity will not be struck in the event
that the ceiling-hanging bracket slips out
of position, use at least two wire ropes
provided with some slack to prevent the
bracket from falling down.
Besides, install a swing stop according to
the circumstance.
※ After the installation, remove the eyebolt.
Remove the eye bolt and insert the eye bolt cap
(provided with the plasma display).
Carefully store the removed eyebolt.
Adjusting the installation angle
With the plasma display suspended from the bracket,
adjust the display so that the stay
※ If the stay
is not horizontal, the plasma display will
not be set at the angle which was selected in step 6-3.
Caution
If using LAN cable to connect plasma display, connect the LAN cable so it is separated from other cables (this
does not include the power cord).
Removing the plasma display from the bracket
Reverse the installation procedure to remove the display.
Caution
Because the display is heavy, handle it carefully by the use of lifting equipment (machine).
Fall
prevention
is horizontal.
Suspend
Suspend
Suspend
Swing stop
Plasma Display
Selected angle of
plasma display
Suspend
Fall
prevention
Swing stop
Stay
23

Publicité

Table des Matières
loading

Table des Matières