Panasonic TY-CE85PS12 Manuel D'installation page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
5. Install the brackets.
Install the gaskets which were adhered at the bracket preparation
stage so that they touch the plasma display.
1. Secure the bracket 1
mounting screws
2. Secure the bracket 2
mounting screws
3. Secure the bracket 3
mounting screws
The screws should be securely tightened to the torque given
below.
(2.2~3.0 N•m)
6. Install the frame.
Any of five settings can be selected for the angle at which the
display is to be suspended: 0 degree (perpendicular), 5 degrees, 10
degrees, 15 degrees or 20 degrees.
Which assembly holes in the columns are to be used depends on
the angle at which the display is to be installed.
1. Remove collar
of the prepared M16 bolts
into the frame mounting hole in the top part of the column.
※ When the collar cannot be inserted into the frame mounting
hole, loosen the M8 bolts (60 mm)
2. Install the frame which was assembled in step 3 on the previous
page onto the column, and secure it using the prepared M16 bolt
whose collar was removed and the nut
3. Select the mounting hole for the desired angle, and secure it
using the prepared M16 bolt
The bolt should be securely tightened to the torque given below.
(16~20 N•m)
to the column using the bracket
.
to the column using the bracket
.
to the column using the bracket
.
to adjust the hole.
.
and the nut
, and insert collar
Prepared M16 bolt
was removed
.
10°
15°
20°
Bracket mounting
screws
Collar
1
whose collar
2
3
Prepared M16 bolt
21

Publicité

Table des Matières
loading

Table des Matières