Panasonic TY-CE85PS12 Manuel D'installation page 22

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
Assembly
7. Attach the lead wires.
Secure the lead wires
the lead wire mounting screws
※ Point the flat surfaces of the lead wire terminals toward
the ceiling-hanging bracket.
※ Route the lead wires in such a way that they will not be
too visible from the outside.
1. Secure the lead wire
using the lead wire mounting screws
※ Change the holes to be used in accordance with the
angle which was selected in step 6-3.
: 0 degree, 5 degrees, 10 degrees
: 15 degrees, 20 degrees
2. Secure the lead wire
using the lead wire mounting screws
3. Secure the lead wire
lead wire mounting screws
4. Secure the lead wire
wire mounting screws
5. Fasten the end of the lead wire
to the column
using the lead wire mounting screws
that the tube section is not overlapped.
The screws should be securely tightened to the torque
given below.
(2.2~3.0 N•m)
8. Install the joint.
Install the joint
onto the left and right frames.
1. As shown in the figure below, align the holes of the joint
from the outside.
2. Put the nuts
in from inside the frame, and fasten them with the M8 bolts (20 mm)
The bolt should be securely tightened to the torque given below.
(7~10 N•m)
22
to the column and frame using
.
to the column
and frame
.
to the frame
and stay
.
to the column
using the
.
to the stay
using the lead
.
, which was secured
and stay
, to the base
while ensuring
2
1
Lead wire mounting screws
as well
with those of each frame, and insert M8 bolts (20 mm)
2
Tube section
Ceiling-hanging bracket
4
5
3
Lead wire mounting
screws
1
.
Lead wire
2
1

Publicité

Table des Matières
loading

Table des Matières