Wall Outlet; Roof Outlet; Opening The Door; First Install The Flue System, And Then Place The Gas Unit - WANDERS Square 40 G Mode D'emploi Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Make your choice from the installation possibilities. Place the first meter of the concentric pipe on the
counterpart on the appliance. You will know that you placed it properly if you can see the blue rubber seal
ring when looking from above. Keep a distance of at least 5 cm between the inner side of the concentric pipe
and the wall or the ceiling.
Pay special attention to proper installing when, due to circumstances, a part of the double-walled pipe system
must be built in.

Wall outlet

Always allow one metre vertical before passing through the outer wall.
The maximum length of the horizontal placed pipes is 3 meters.
Determine the location of the gas unit and the exterior wall duct.
Make an opening of Ø 155 mm for the wall duct.
Connect the wall duct with a curve to the mouth of the appliance. Push them firmly together and place the
clip bindings. The blue rubber ring ensures sufficient sealing of the discharge system of the waste gas.
If the appliance is placed more than 1 metre from the wall, place the vertical one-metre pipe first on the
appliance, then place the curved part, then the exterior wall duct, and then make them gastight.

Roof outlet

You can place the outflow anywhere on the roof, if necessary with a bend to the ridge of the roof. The roof duct
is supplied with a universally adjustable roof tile for a tilted roof, or with an adhesive plate for a flat roof.
Determine the location of the gas unit and the outflow to the roof.
Make an opening of Ø 155 mm for the roof duct.
Connect the pipes vertically to the mouth of the appliance. Push them firmly together and place the clip
bindings.
Determine the length of the pipes needed and make sure that the transfer tile or the universal roof tile is
well fitted to the roof.
Saw the outer pipe off to measure, and connect the concentric pipes to the roof duct.

First install the flue system, and then place the gas unit

You may also fit the concentric pipe system before placing the gas unit, but then you must the connection to
the gas unit with a pipe that can be shifted.

Opening the door

You can open the door by lifting the frame and unscrewing the two 8mm screws and remove the glass pane
and the glass.