Unpacking; Checking The Scope Of Delivery; Dimensions Of The Product And The - Vaillant VPS R 100 1 M Notice D'installation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
4 Installation
4.1

Unpacking

1.
Remove the product from the packaging.
2.
Remove the protective film from all of the product's
components.
4.2

Checking the scope of delivery

Check the contents of the package.
Applicability: VPS R 100/1 M
Quantity
Description
1
Buffer cylinder
1
Bag with three feet, three washers and six
nuts
2
Wall-fixing strip
4
Pin for securing the wall-fixing strip to the
cylinder
1
Lower cover, which must be attached when
securing the cylinder to the wall
3
Pin for securing the cover, washer and cover
for the pin
1
Cylinder dry pocket
1
Stuffing box
6
G1"1/2 plug + seal
1
Documentation records
Applicability: VPS R 200/1 B
Number
Description
1
Buffer cylinder
1
Bag with three feet, three washers and six
nuts
2
Cylinder dry pocket
2
Stuffing box
6
G1"1/2 plug + seal
1
G3/4 plug for draining the cylinder
1
Enclosed documentation
70
4.3

Dimensions of the product and the

connections
4.3.1
Cylinder with 100-litre capacity
Ø563
256
4.3.2
Cylinder with 200-litre capacity
Ø600
Installation and maintenance instructions 0020244064_01

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vps r 200 1 b

Table des Matières