External Operation - Daikin EHSX04P30D Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 115
3
Operation
10 Briefly press the rotary button to confirm ("OK").
è Input window for the start time of the second switching cycle
flashes blue.
11 Turn the rotary button clockwise until the required start time is
displayed.
12 Briefly press the rotary button to confirm ("OK").
è The display changes to the input window for the end time of
the second switching cycle.
13 Turn the rotary button clockwise until the required end time is
displayed.
14 Briefly press the rotary button to confirm ("OK").
è The display changes to the input window for the start time of
the third switching cycle.
15 Turn the rotary button clockwise until the Confirm icon turns
blue.
è The display changes to the Confirm icon.
16 Briefly press the rotary button to confirm ("OK").
è The programming is saved.
è The setting level is exited.
è Selected switching cycles are highlighted in grey.
17 Turn the rotary button anticlockwise until the Back icon turns
blue.
18 Briefly press the rotary button to confirm ("OK").
è The menu is exited
3.3.8

External operation

In addition to operation via the integrated RoCon+ HP control sys-
tem, the system can also be adjusted and operated via external
devices.
Operation via the Internet
An optional gateway (EHS157056) can be used to connect the con-
trol unit RoCon+ HP to the Internet. This enables remote control of
the RoCon+ HP by mobile phones (by app).
Operation via the room station
It can also be operated via the optional EHS157034 room controller.
For this purpose, observe the operating instructions enclosed with
the device.
Operating Instructions
12
Daikin RoCon+ HP
Daikin Controller RoCon+ HP
008.1444299_01 – 09/2018 – EN

Publicité

Table des Matières
loading

Table des Matières