Initial commissioning

INFORMATION
In addition to the commissioning instructions listed in this
chapter, the specific commissioning instructions listed in
the respective installation instructions for the Daikin
Altherma EHS(X/H) must be observed.
5.1

Configuration Wizard

The Configuration Wizard simplifies system configuration during in-
stallation. It appears automatically during initial commissioning and
guides the user through defined selection pages. As long as the en-
tire system setting is not confirmed, the Configuration Wizard is
called up again each time it is switched on. Only after confirmation of
the system setting can the heat generator switch to normal opera-
tion. In normal operation, the parameters of the Configuration Wizard
can be called up and set in the menu [→ Main menu → Configura-
tion → Wizard].
The different selection pages of the Configuration Wizard are oper-
ated according to the screens described in
selection with "OK" or the Confirm icon leads directly to the next se-
lection page. The modified parameter is applied directly.
5.2
Menu navigation in the
Configuration Wizard
→Language
1
Select the desired language.
2
Confirm the selection with the Confirm icon.
→Standard configuration
If no optional RoCon system components are connected:
1
Briefly press the rotary button to confirm ("Yes").
When optional RoCon system components such as EHS157034
and/or EHS157068 are connected:
1
Turn the rotary button clockwise until "No" is displayed in blue.
2
Briefly press the rotary button to confirm ("OK").
3
Select and set the following list elements as required:
▪ Direct circuit configuration(see
▪ Bus ID heat generator(see
▪ Time master(see
Chap.
7.11)
4
If all settings have been made as required, confirm by clicking on
the Confirm icon.
→Time
1
Setting the current time (see
→Date
1
Setting the current date (see
→ System parameters
The following parameters can be set:
▪ [Room thermostat] present? (see
▪ [Heating support (HZU)] required? (see
▪ [Continuous heating] required? (see
→ Heating limit
The following parameters can be set:
▪ [Heating operation limit] (see
▪ [Heat limit reducing mode] (see
Daikin RoCon+ HP
Daikin Controller RoCon+ HP
008.1444299_01 – 09/2018 – EN
Chap.
3.3. Confirming a
Chap.
4.8)
Chap.
4.8)
Chap.
3.3.5).
Chap.
3.3.6).
Chap.
7.5.4)
Chap.
7.5.5)
Chap.
7.5.5)
Chap.
7.5.3)
Chap.
7.5.3)
5
→Weather-compensated
Weather-compensated control is required:
1
Confirm the "Weather-compensated" selection with the Confirm
icon.
The following parameters can be set:
▪ [Room temperature setpoint 1] setting (see
▪ [Heat-Slope] setting (see
Chap.
▪ Only with reversible device type: Setting of the cooling curve
(see
Chap.
4.5.5)
Weather-compensated control is not required:
1
Select the "Feed temperature, fixed" setting.
2
Confirm the selection with the Confirm icon.
The following parameters can be set:
▪ [Feed temperature heating mode] setting (see
▪ Only with reversible device type: Setting [Feed temperature
cooling mode] (see
Chap.
7.6.4)
→Hot water
The following parameters can be set:
▪ [Hot water temp. setpoint 1] (see
▪ [Hot water hysteresis] (see
→ Device selection
The following parameters can be set:
▪ [Outdoor unit]
▪ [Indoor unit]
→ External heat generator
No external heat generator available:
1
Select the "No external heat generator" setting.
2
Confirm the selection with the Confirm icon.
Optional backup heater available:
1
Confirm the "Backup heater BUH" selection with the Confirm
icon.
2
Select and set the following list elements as required:
▪ [External power hot water] (see
▪ [External power stage 1] (see
▪ [External power stage 2] (see
▪ Emergency operation(see
Chap.
3
If all settings have been made as required, confirm by clicking on
the Confirm icon.
Alternative external heat generator available:
1
Select the "DHW + heating support" or "Two external heat gen-
erators" setting (see
Chap.
7.5.3).
2
Confirm the selection with the Confirm icon.
3
Select and set the following list elements as required:
▪ [External power hot water] (see
▪ [External power stage 1] (see
▪ Emergency operation(see
Chap.
4
If all settings have been made as required, confirm by clicking on
the Confirm icon.
→Heating system
1
The [Heating system] parameter can be set (see
Initial commissioning
Chap.
7.5.1)
4.5.4)
Chap.
7.6.3)
Chap.
7.3.4)
Chap.
7.6.5)
Chap.
7.5.3)
Chap.
7.5.3)
Chap.
7.5.3)
8.1)
Chap.
7.5.3)
Chap.
7.5.3)
8.1)
Chap.
7.5.2).
Operating Instructions
25

Publicité

Table des Matières
loading

Table des Matières