5.7 Assembling the burner (Fig. 9)
The assembly of the burner to the door of the boiler must ensure perfect tightness to the products of combustion.
Once having installed the burner on the boiler, the space between the burner draught tube and the refractory material on the door must be
filled with the layer of ceramic fibre (A) supplied. This prevents the door from overheating and consequently from being irreversibly deformed.
The fuel connections to the burner must be located so as to allow the complete opening of the boiler door with the burner installed.