Installation; Mechanical Installation - Hach Lachat BD40 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
Figure 2 Digestion block
1 Graphite block (SiC coated)
2 Reaction tube and cooling rack
3 Heat deflector shield (2x)
4 Digestion tube (40x)

Installation

Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.

Mechanical installation

Assemble the digestion block
Personal injury hazard. Instruments or components are heavy. Use assistance to install or move.
Figure 3
shows the assembly of the digestion block. Make sure to hold the digestion block by the
base to move it.
5 Cold finger (40x)
6 Temperature calibration connection
7 Cable, controller to digestion block
D A N G E R
W A R N I N G
English 7

Publicité

Table des Matières
loading

Table des Matières