Ingeteam INGECON SUN STORAGE 1Play Série Manuel D'installation page 85

Masquer les pouces Voir aussi pour INGECON SUN STORAGE 1Play Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 155
Connecting the synchronization input for three-phase systems
2.
Connect the synchronism phase wiring to either of the two positions of terminal J61 PHASE SYNC as
shown in the previous figure. Ingeteam recommends using a tubular terminal in accordance with DIN 46
228/1.
3.
Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut. Check that the connection is tight.
ABH2013IQM01_A - Installation and Operation Manual
N
R
J56
AC Loads
R
J61
Sync AC
T
N
S
J56
AC Loads
S
J61
Sync AC
R
N
T
J56
AC Loads
T
J61
Sync AC
S
Ingeteam
DE
EN
ES
FR
IT
PT
85

Publicité

Table des Matières
loading

Table des Matières