Beretta Mynute Boiler Green E 25 B.S.I. Manuel D'installation Et D'utilisation page 152

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
Mynute Boiler Green E B.S.I.
OT+
A
−t°
M6
230 V
L
N
M3
F
M6
[EN]
A - External probe
B - Room thermostat (24 Vdc)
C - Low temperature thermostat/Generic alarm
Low voltage devices should be connected to connector as shown
in the fi gure.
M6 OT+/External probe/Room thermostat or heating time pro-
grammer (POR), after removing the black U-bolt in terminal
board
M2 Domestic water time programmer (POS) after removing the
purple U-bolt in terminal board
M2a Low temperature thermostat/Generic alarm after removing the
white U-bolt in terminal board
The POR and POS contacts must be dimensioned to 24 Vdc
152
B
C
M2a
M3
P.O.R.
M
230 V
L
N
M3
F
230 V
L
N
F
M6
[FR]
A - Sonde extérieure
B - Thermostat ambiant (24 Vdc)
C - Thermostat basse température / alarme générique
Des dispositifs basse tension doivent être raccordées au connect-
eur comme indiqué sur la fi gure.
M6 OT+/sonde extérieure/thermostat ambiant ou programmateur
de chauffage (POR), après dépose du cavalier noir sur le
bornier
M2 Programmateur eau chaude sanitaire (POS) après dépose du
cavalier mauve sur le bornier
M2a Thermostat basse température/alarme générique après
dépose du cavalier banc sur le bornier
Les contacts POR et POS doivent être dimensionnés pour 24 Vdc
P.O.S.
M
M2
P.O.R.
M
G
B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mynute boiler green e 32 b.s.i.2009618920096190

Table des Matières