Once the cleaning operation has been completed, using the spe-
cial kit supplied as an accessory, the total hour meter will need to
be reset to zero as follows:
- switch off the power supply
- remove the shell
- turning the instrument panel towards you
- unscrew the two screws of the small cover on the electronic
board to have access to the terminals
- while the boiler is powered up, using a small screwdriver includ-
ed, press the CO button (fi g. 9) for at least 4 seconds, to check
the meter has been reset, power down then power up the boiler;
the meter reading is shown on the monitor after the "-C-" sign.
Live electrical parts (230 Vac).
Note: the meter resetting procedure should be carried out after
each indepth cleaning of the primary exchanger or if this latter is
replaced. To check the status of the total hour meter, multiply the
reading by 100 (e.g. reading of 18 = 1800 total hours; reading of 1
= 100 total hours).
The boiler continues to operate normally even when the alarm is
activated.
BOILER STATUS
Stand-by
OFF status
ACF module lockout alarm
ACF electrical fault alarm
Limit thermostat alarm
Air pressure switch alarm
H2O pressure switch alarm
NTC domestic water fault
Primary (fl ow) thermistor fault - Primary (fl ow) thermi-
stor over temperature - Temperature differential
Return thermistor fault - Return thermistor overtem-
perature - Temperature differential inverted
Flue thermistor or fl ue thermistor counter fault -
Flue thermistor over temperature
False fl ame
Low temperature thermostat fault
Calibration
Service operation
Transient awaiting ignition
H2O pressure switch intervention
Purge cycle mode active
External probe present
Domestic water heat request
Heating heat request
Anti-freeze heat request
Flame present
DISPLAY
-
OFF
A01
A01
A02
A03
A04
A06
A07
A08
A09
A11
A77
ADJ
ACO
88
°C
fl ashing
fl ashing
60
°C
80
°C
Mynute Boiler Green E B.S.I.
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mynute boiler green e 32 b.s.i.2009618920096190

Table des Matières