9.3
maintenance of the device
→
Regularly examine the gasket and the oval rotors for good con-
dition. Follow the instructions on chap. 9.4.
Clean the device with a cloth slightly dampened with water or a
cleaning liquid compatible with the materials the device is made of.
Your Bürkert supplier is at your disposal for any further information.
1
2
3
4
5
1. Screws
2. Cover
3. Rotor shafts
4. Rotors
41. Active rotor (with magnet)
42. Neutral rotor (no magnet)
Fig. 6
Exploded view of the device
16
6
7
8
9
5. Gasket
6. Body
7. Cam
8. Circlip
9. Electronic module
10. Dimple
English
Type 8077
Maintenance and troubleshooting
9.4
replace the rotors
Disassembly
→
Ensure the fluid supply to the meter has been disconnected, and
the line pressure has been released.
→
Remove the screws [1] and the cover [2].
→
Remove the gasket [5] and inspect; replace if damaged.
→
Remove rotors [4], clean and inspect; replace if damaged.
Fig. 7
Correct position of the rotors
Active Rotor
(smooth side)
10
41
42
6