Connecting The Pneumatic System En - Abicor Binzel BRS-CC Mode D'emploi

Masquer les pouces Voir aussi pour BRS-CC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 Putting into operation
5.10 Connecting the pneumatic system
For the supply, a compressed air hose with a min. inner width of
connection plate of the assembly stand by means of a screw connection (not included in the delivery). A
shut-off valve in the supply line is recommended. This allows the BRS-CC to be quickly and simply
depressurized in order to carry out any installation and maintenance work.
The maintenance station BRS-CC must remain without pressure until installation has been completed.
NOTE
The cutting capacity of the DAV depends on operating pressure, number of revolutions of the motor and
atomisation of the anti-spatter fluid. Determine the most favourable adjustment in a test run.
Fig. 12
EN - 15
WARNING
Motor
off
on
Clamping cylinder
loosen clamp
Z2
M
LW 6
LW4
Y2
Y1
4
2
14
12
14
5
3
1
Connecting the pneumatic system
ø
6mm is required; it is fastened to the
Stroke cylinder
Wire cutter
down
open
close
up
Z1
Z3
S1
LW4
LW4
LW4
Y3
4
2
4
2
14
12
5
3
5
3
1
1
LW6
BRS-CC
Injector
on
off
LW4
LW6
LW4
LW4
Y4
4
2
12
14
12
5
3
1

Publicité

Table des Matières
loading

Table des Matières