STORAGE
When preparing the generator for storage, allow the unit to cool for 30 minutes then follow the guidelines below.

STORAGE TIME

Less than 2 months   Remove the 1 lb. propane cylinder or fully close the 20 lb. propane cylinder valve, then discon-
2 months to 1 year
  Remove the 1 lb. propane cylinder or fully close the 20 lb. propane cylinder valve, then discon-
1 year or more
  Remove the 1 lb. propane cylinder or fully close the 20 lb. propane cylinder valve, then discon-
  Remove spark plug.
  Put a tablespoon of engine lubricant into the spark plug cylinder. Turn the engine slowly with the
  Reinstall spark plug.
  Change engine lubricant.
WARNING: Propane cylinders must be stored outdoors out of reach of children and must not be stored in a
building, garage, or any other closed-in area.

MAINTENANCE SCHEDULE

NOTE: If a separate engine manual is provided for this generator, please follow the maintenance schedule provided in the
engine manual instead of the maintenance information listed below.
Check Engine Lubricant
Change Engine Lubricant
Check Air Filter
Clean Air Filter
Change Air Filter
2
Check/Adjust Spark Plug
Replace Spark Plug
2
Check/Clean Spark
Screen
Check/Adjust Valve
Clearance
1,2
Check All Hose
Connections
1. These items should only be carried out by a qualified service center.
2. See engine manual for maintenance schedule for this item.
NOTE: Maintenance should be performed more frequently when generator is used in dusty areas.
When generator has exceeded the maximum figures specified in the table, maintenance should still be cycled according
to the intervals of time or hours stated herein.
MAINTENANCE
nect the propane hose adaptor.
nect the propane hose adaptor.
nect the propane hose adapter.
pull rope to distribute the lubricant.
After 1st month
Before
or 20 hours of
each use
operation
2
PRIOR TO STORING
Every 3 months
or 50 hours of
operation
19 — English
Every 6 months
Every year or
or 100 hours
after 300 hours
of operation
of operation