Télécharger Imprimer la page

Eurosystems TR 80 Manuel D'utilisation Et D'entretien page 40

Publicité

Les langues disponibles
  • FR

Les langues disponibles

For specific descriptions of the respecti-
ve commands refer to chapter "Use" and
"Operating commands" in the machine's
operation and maintenance manual.
5.7. CLEANING DURING THE WORKING
DAY
If it becomes necessary to clean the ma-
chine during the day (weeds, dirt, mud
etc.) turn off the engine and remove the
ignition key and/or the hood of the spark
plug to prevent inadvertent starting.
DANGER!
Before entering the danger zone, wait
for all the machine's moving parts to
come to a standstill (at least ten sec-
onds from the stopping of the engine).
DANGER!
Wait for the hot parts of the machine to
cool down (at least 15-20 minutes).
DANGER!
Pay attention to the cutting elements.
6. MAINTENANCE
In addition to observing the safety and
operational instructions it is just as impor-
tant to follow the following maintenance
EN-12
instructions.
ATTENTION!
Never carry out maintenance or clean-
ing operations with the engine on.
Before working on the accessory/tool
always remove the ignition key and/or
spark plug cap to prevent sudden or un-
expected starting.
ATTENTION!
After the machine has come to a stop
cool the hot surfaces down for at least
15 to 20 minutes before approaching it.
ATTENTION!
Always wear gloves, safety footwear,
glasses and use adequate work equip-
ment during maintenance of knives
and/or other sharp parts.
ATTENTION!
Do not carry out repairs involving weld-
ing, drilling, grinding etc. on structural
components and safety devices.
Only use genuine Eurosystems parts. All
the other commercial parts must corre-
spond to the technical and quality specifi-
cations determined by Eurosystems.

Publicité

loading