Télécharger Imprimer la page

Agilent IDP-3 Mode D'emploi page 177

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
Technical Information
Figure 26 Exploded View of Pump Bod
To test the pump:
1
2
Newly installed Tip Seals may require several hours of run time to seat properly and
NOTE
enable the pump to meet speed and base pressure specifications.
Run the pump for about 5 seconds. Verify that the front fan is running.
If you hear loud noises or observe labored operation, this indicates that the Tip
Seal or main O-ring are possibly out of place.
Disassemble and repair as necessary.
The pump is now ready to return to service.
1. Front Cowling Bolts; M5 (4)
2. Front Cowling
3. Frame Bolts; M5 (4)
4. Outboard Housing
5. Tip Seals (Not shown)
6. Main O-ring Parker No. 2-160
(not shown)
7. Locating Pins (2)
8. Orbiting Scroll
9. Frame
177

Publicité

loading