Drive Belts - Husqvarna ST 424 Manuel D'utilisation

Masquer les pouces Voir aussi pour ST 424:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Replace the fuse for engine control unit (A) with
a 5 A fuse.
Replace the fuse for the starter solenoid (B) with
a 20 A fuse.
Replace the fuse for the LED and the heated grip
(C) with a 5 A fuse.
Position (D) contains a backup 5 A fuse.
To examine the tires
Keep the tires free of fuel, oil and chemicals to
prevent damage to the rubber.
Keep the tires away from stumps, stones, ruts,
sharp objects and other objects which can cause
damage to the tires.
Keep the tire pressure correct, see
data on page 29 .
To clear a clogged discharge chute
deflector
Do not unclog the discharge chute deflector before
the following operations are made.
1. Release the auger engagement and the drive
engagement at the same time.
2. Wait 10 seconds to make sure that the augers
have stopped.
3. Stop the product.
4. Use the tool for cleaning (at least 37 cm (15 in.)
long, included in some models) to remove the
clog.
WARNING: Do not put your hands
into the discharge chute deflector or
inside the auger bucket.
20
To replace the scraper bar
1. Put the scraper bar (A) in a reversed position
A
B
C
D
2. Replace the scraper bar if it is worn on both

Drive belts

To prepare for replacement of the belts
Technical
1. Remove the fuel from the fuel tank.
2. Loosen the lock nut (A) that secures the chute
when it is worn to the edge of the housing.
sides or if it is damaged.
WARNING: The v-belts on your product
are of special construction and should be
replaced by original equipment
manufacturer (OEM) belts available from
your nearest service center. To use
other belts than OEM can cause
personal injury or damage to the
product.
WARNING: The belt replacement
requires separation of the product. While
separating the auger housing from the
frame, it is important that an assistant
stands in the operating position and
holds the product handles. Serious
personal injury and/or damage to the
product could occur if the product falls
during the belt replacement process.
rotator head (B) to the mounting bracket (C) to
remove the discharge chute.
A
876 - 011 - 11.05.2020

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

St 427St 430St 424tSt 427tSt 430t

Table des Matières