Operation; General; Installing The Pump; Start Up - arjo Flowtron ACS900 Notice D'utilisation

Masquer les pouces Voir aussi pour Flowtron ACS900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Operation

General

Installing the Pump 1. The pump should be placed feet down on any

Start Up

Mains Power Connected
These instructions cover the routine operation of the
system. Other operations, such as maintenance and
repair, should only be carried out by suitably qualified
personnel.
Refer to "Controls, Alarms and Indicators" on page 6
for a description of the controls, indicators and LCD
screen.
If the operation or performance of the pump
changes during use, refer to "Troubleshooting"
on page 22 of this IFU before calling a service
engineer or contacting your local Arjo sales
office.
convenient horizontal surface or alternatively
suspend the unit with the use of bed hooks
(integral hanging brackets).
2. Beyond placing the pump on the bed frame or on
the floor, the use of IV Pole Bracket or Wall
Bracket should be considered.
3. Depending on the therapy environment, the
pump may also be secured with the use of
alternative solutions, such as the additional
bracket mounted to the bed frame. The
appropriate solution should be chosen to ensure
patient safety.
1. To switch on the pump, do one of the following:
• Connect the pump to the mains power supply
using the power cable provided.
• If operating on battery (the pump is
disconnected from the mains power supply),
press the Power button.
2. The pump will power up automatically and start
running a diagnostic test and initialising the
pump. One of the following screens will be
displayed, with a rotating 6-segment circular
icon:
11
Mains Power Disconnected

Publicité

Table des Matières
loading

Table des Matières