11. Install Blower Cord at Control - Remote

Install the Second Junction Box on the Control
Install a second junction box with external bonding lug, two strain reliefs, and a cover (not
supplied) on the blower adapter board on the control.
Connect a solid copper 8 gauge bonding wire from the bonding lug on the new junction box to the
spare bonding lug on the control. Follow all local electrical codes.
Reconnect the Blower Motor Power Cord
If required, reconnect the blower motor power cord at the control.
Route the power cord through a strain relief on the second junction box. Tighten the strain relief.
At the end of the cut power cord, strip back the cable jacket about 3" (7.6 cm).
Using a wire nut, cap off the unused brown conductor in the cable jacket.
Strip the wire insulation about 3/8" (1 cm) of the remaining wires from the control.
Terminate the New Power Cable
Route the new power cable from the blower through the other strain relief on the second junction
box. Tighten the strain relief.
Strip back the cable jacket about 3" (7.6 cm).
For installations in the United States, mark the white wire with either red or black electrical tape as
required by the NEC.
Strip the end of the wires about 3/8" (1 cm).
Use approved termination devices to terminate the conductors as follows:
• Terminate the black pigtail lead to the L1 conductor of the power cable.
• Terminate the blue pigtail lead to the L2 conductor of the power cable.
• Terminate the green with yellow stripe pigtail lead to the grounding or earthing conductor of the
power cable.
• Terminate the brown wire with a wire nut. The brown wire is not used.
Install the cover on the new junction box.
Kohler Co.
All manuals and user guides at all-guides.com
Strip back the jackets about
3" (7.6 cm) on the field cable
and on the blower motor pigtail.
Brown
Then cut the unused fourth
Wire Nut
conductor brown wire off
at the point that the
From Control
cable jacket ends.
60 Hz
50 Hz
From Control
Black
L1
L1
L2
N
Blue
Green w/Yellow Stripe
GND
GND
NC
NC
Brown
Control Power Junction Box
Blower Adapter
Board
New Field
Cable To
Blower Motor
Route the cut end of the cord to
the new junction box. Add strain relief.
15
Blower
Motor Pigtail
Second
Junction Box
Install junction box with cover
and bonding lug (not provided).
1143444-2-A