the rough
plumbing.
Verify that the subfloor
offers adequate support,
and is flat and level.

1. Prepare the Site - Wood Construction

CAUTION: Risk of property damage. Do not support the bath by the rim.
NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your bath
for specific floor loading requirements.
NOTICE: Provide adequate ventilation and a minimum of 15 cubic feet (.4 cubic meters) in the installed
location for cooling the motor and to supply sufficient air for the blower. Do not install the blower motor
closer than 1" (2.5 cm) from the wall or other objects.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and
level.
The bath may be used in an alcove installation. Construct 2x4 stud framing designed for your
particular installation. Frame the floor in accordance with the roughing-in information packed with
the bath.
Provide an access panel to service the blower motor and control.
Position the plumbing according to the roughing-in information. Cap the supplies, and check for
leaks.
1143444-2-A
All manuals and user guides at all-guides.com
Construct 2x4
stud framing
according to
the roughing-in
information.
Typical access panel