Prepare The Site - Kohler K-1106 Guide D'installation

Masquer les pouces Voir aussi pour K-1106:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Whirlpool
Rim
Drop-In Installation
Allow for the thickness of
the planned deck material.
Whirlpool
Rim
Wood
Batten
Flush Installation

1. Prepare the Site

NOTICE: Refer to the Roughing-in Guide packed with your whirlpool for the required minimum
lb/square foot (kg/square meter) floor support loading.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
NOTICE: The whirlpool should be installed in a drop-in, flush, or tiled ledge installation.
Construct 2x4 or 2x6 stud framing designed for your particular installation.
NOTICE: The whirlpool must be supported by its feet or base. Do not support the load weight of the
whirlpool by the perimeter of the rim.
For a raised installation: Frame the floor or construct a frame in accordance with the roughing-in
information packed with the whirlpool.
Carefully lay out and cut the rough deck material. Use the cut-out template, if one is provided, or
refer to the Roughing-In Guide for cutout information.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.
1010564-2-K
Do not support
the whirlpool
by the rim.
Use the roughing-in
information to
construct the stud
framing.
Whirlpool
Rim
Tiled Ledge Installation
4
Use the roughing-in
information to
construct the stud
framing.
Kohler Co.

Publicité

Table des Matières
loading

Table des Matières