Make Supply Power Connections - Remote; Test Run The Bath With Airjets - Kohler K-723 Guide D'installation

Baignoire à jets d'air
Masquer les pouces Voir aussi pour K-723:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Check Valve
Remote Blower
New Field Cable To Blower Motor

12. Make Supply Power Connections - Remote

WARNING: Risk of electric shock. To reduce the risk of electric shock, connect the control to a
properly grounded Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device (RCD). This
will provide additional protection against line-to-ground shock hazard. A dedicated 220-240 V, 15 A,
50/60 Hz circuit is required.
WARNING: Risk of electric shock. Make sure the power has been disconnected before performing
the following procedures.
NOTE: The model number and electrical rating for the bath is printed on a label near the bath blower
motor.
Ensure that the control power supply cord is properly routed to the control power junction box. The
control power supply cord contains a brown wire (Line 1), a blue wire (Line 2), and a green wire
with a yellow stripe (ground or earth).
Install a strain relief (not provided) for the power supply cable to the control power junction box.
Route the power supply cable to the control power junction box.
As required, strip the jacket and wire insulation on both cables to make the connections.
For installations in the United States, mark any white conductor in the supply power wiring with
red or black tape as required by the NEC.
Connect service to the control power junction box.
Provide a separate equipment earthing or grounding conductor to the spare earth/ground lug
located on the control power junction box. This conductor must not be connected to any
current-carrying conductor. Follow local electrical codes.
Bond in accordance with national and local codes.
Clean the area of all dust and debris.
All wiring harnesses have been pre-wired at the factory. Ensure that all wires are securely fastened.
NOTE: Your wiring harness includes an antenna for the optional remote control. Do not alter or damage
this antenna during installation.

13. Test Run the Bath With Airjets

NOTE: If the bath is not operating properly, consult the "Troubleshooting" section of this guide before
calling a qualified service representative.
NOTE: For additional information on operating the bath, see the "Operate User Keypad" section.
1143444-2-A
All manuals and user guides at all-guides.com
Typical Remote Blower Installation
Power Supply Cable
Blower Motor Cord
Control Power Junction Box
Control Power Supply
Second Junction Box
(added for Remote Blower)
16
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-724

Table des Matières