Prepare The Installation - Best CP34 Serie Instructions D'installation

Masquer les pouces Voir aussi pour CP34 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. PREPARE THE INSTALLATION

When performing installation, servicing or cleaning the unit, it is recommended to wear safety glasses and gloves.
Make sure that the following items are included:
- Power Pack
- Accessories:
• Baffle filters: CP34 and CP35: 3 for the 30'' and 36'' width models, 4 for the 42'' width model; CP37: 5 for
this 48'' width model
• Baffle filters handles (taped inside the power pack): CP34 and CP35: 3 for the 30'' and 36'' width models,
4 for the 42'' width model; CP37: 5 for this 48'' width model
• 2 Shielded halogen lamps (120 V, 50 W, MR16 with GU10 base or PAR16 with GU10 base)
• 8" round adapter and damper (included with single blower power packs)
• 10" round in-line vertical damper (included with dual blower power pack)
• 10" round adapter (included with dual blower power pack)
• Bag of parts including: (1) wire clamp, (2) wire connectors, (4) no. 8 x 3/8" screws,
(9) no. 8 x 1/2" chrome plated screws, (10) no. 8-32 x 1/4" screws. If need be, discard extra screws.
Parts sold separately:
- Ducts, elbows, wall and roof caps. Refer to page 3 for a complete list of venting options and model numbers.
NOTE: During installation, protect countertop and/or cooktop.
2. INSTALL DUCTWORK AND ELECTRICAL WIRING
Plan where and how the ductwork will be installed. Access to the top of the
hood is preferred for connection of ductwork.
Install proper-sized ductwork, elbows and roof or wall cap for the type of blower
you are installing. If installing CP34 or CP35 power pack, use 8" round
ductwork and if installing CP37 power pack, use 10" round ductwork. Use
2" metal foil duct tape to seal duct joints.
The minimum hood distance above cooktop must not be less than 24".
A maximum of 30" above cooktop is recommended for best capture of
cooking impurities.
Distances over 30" are at the installer and users discretion.
Run 3-wire power supply cable to installation location. Its length should extend
at least 4 feet below the bottom of the custom hood.
3. CUSTOM HOOD PREPARATION
When building a custom hood, always follow all applicable construction codes and standards.
The custom hood must be constructed to fit the size and shape of the CP34, CP35 or the CP37 power pack models.
See chart and illustration for details.
P
P
M
OWER
ACK
ODELS
CP34 & CP35
CP37
* Dimensions A and B include rivets head.
!
!
W
T
R
IDTH
OTAL
ANGE
W
EIGHT
A*
30"
33
19
5
LB
1 6
36"
37.2
19
5
LB
1 6
42"
41.6
19
5
LB
1 6
48"
56.5
22
9
LB
1 6
WARNING
Wall
cap
HH0101A
WARNING
H
D
OOD
IMENSIONS
B*
C
"
28
7
"
4
7
"
1 6
8
"
34
7
"
4
7
"
1 6
8
"
40
7
"
4
7
"
1 6
8
"
46
7
"
5
7
"
1 6
8
- 4 -
Roof cap
8" round duct for CP34 & CP35
or 10" round duct for CP37
8" round elbow for CP34 & CP35
or 10" round elbow for CP37
10" in line
vertical damper for CP37
8" round adapter & damper
for CP34 & CP35 or
10" round adapter for CP37
Power pack
24" to 30"
above
cooking surface
M
CP34 & CP35 (
ODELS
CP37 (
OR
DUAL BLOWER
T
D
YPICAL
UCTWORK
REAR
C L
3"
12"
B
HD0296A
FRONT
)
SINGLE BLOWER
)
4½"
7/8"
C
A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cp35 serieCp37 serie

Table des Matières