Hach TU5300 sc Manuel D'utilisation Simplifié page 26

Masquer les pouces Voir aussi pour TU5300 sc:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
9.6 Replace the vial
Keep water out of the vial compartment or instrument damage will occur. Before the automatic
cleaning module is installed on the instrument, make sure that there are no water leaks. Make sure
that all tubing is fully seated. Make sure that the green O-ring is in place to seal the vial. Make sure
that the vial nut is tight.
Hold the automatic cleaning module vertically when it is installed on the instrument or the
vial can break. If the vial breaks, water will get in the vial compartment and instrument
damage will occur.
Do not to touch or scratch the glass of the process vial. Contamination or scratches on the glass
can cause measurement errors.
Based on the environmental conditions, is necessary to wait a minimum of 15 minutes to
let the system become stable.
Note: Make sure that no particles fall into the vial compartment.
1. Push menu.
2. Select SENSOR SETUP>[select analyzer]>DIAG/TEST>MAINTENANCE>VIAL
REPLACEMENT.
3. Complete the steps that show on the controller display. The date the vial was replaced is
automatically saved after the last screen shows.
Refer to the illustrated steps that follow to replace the vial. To protect the new vial from
contamination, use the vial replacement tool to install the vial.
At illustrated step 3, put the process head on its side on a flat surface if a service bracket is not
installed near the instrument.
26 English
N O T I C E
N O T I C E
N O T I C E
N O T I C E

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tu5400 sc

Table des Matières