Sanyo 3-WAY ECO-i SPW-C0705DZH8 Instructions D'installation page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51
IMPORTANT! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Please Read Before Starting
Check of Density Limit
Precautions for Installation Using New Refrigerant
New refrigerant R410A cannot be used for earlier models
1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1-1.
Tools Required for Installation (not supplied)
1-2.
Accessories Supplied with Outdoor Unit
1-3.
Type of Copper Tube and Insulation Material
1-4.
Additional Materials Required for Installation
1-5.
Tubing Length
1-6.
Tubing Size
1-7.
Straight Equivalent Length of Joints
1-8.
Additional Refrigerant Charge
1-9.
System Limitations
1-10. Installation Standards
1-11. Check of Limit Density
1-12. Installing Distribution Joint
1-13. Optional Distribution Joint Kit
1-14. Optional Solenoid Valve Kit
1-15. Example of Tubing Size Selection and Refrigerant
Charge Amount
2. SELECTING THE INSTALLATION SITE . . . . . . . . . . . . . 18
2-1.
Indoor Unit
2-2.
Outdoor Unit
2-3.
Shield for Horizontal Exhaust Discharge
2-4.
Installing the Outdoor Unit in Heavy Snow Areas
2-5.
Precautions for Installation in Heavy Snow Areas
2-6.
Dimensions of Wind Ducting
2-7.
Dimensions of Snow Ducting
3. HOW TO INSTALL THE OUTDOOR UNIT . . . . . . . . . . . . 24
3-1.
Transporting
3-2.
Installing the Outdoor Unit
3-3.
Routing the Tubing
3-4.
Prepare the Tubing
3-5.
Connect the Tubing
4. ELECTRICAL WIRING . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
4-1.
General Precautions on Wiring
4-2.
Recommended Wire Length and Wire Diameter for
Power Supply System
4-3.
Wiring System Diagram
4-4.
Connecting multiple indoor untits to a single solenoid
valve kit
CONTENTS
Page
5. HOW TO PROCESS TUBING . . . . . . . . . . . . . . . . . . . . . . 32
5-1.
Connecting the Refrigerant Tubing
5-2.
Connecting Tubing Between Indoor and Outdoor
Units
5-3.
Insulating the Refrigerant Tubing
5-4.
Taping the Tubes
5-5.
Finishing the Installation
6. AIR PURGING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
■ Air Purging with a Vacuum Pump (for Test Run) Preparation
7. TEST RUN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
7-1.
Preparing for Test Run
7-2.
Test Run Procedure
7-3.
Main Outdoor Unit PCB Setting
7-4.
Auto Address Setting
7-5.
Caution for Pump Down
7-6.
Meaning of Alarm Messages
8. MARKINGS FOR DIRECTIVE 97/23/EC (PED) . . . . . . . . 48
6
Page

Publicité

Table des Matières
loading

Table des Matières