Bosch EV3000 Guide D'utilisation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

en
8 | EV 3000 | Pre-install Checklists
7.
Pre-install Checklists
Before beginning installation, complete the
following check lists to ensure readiness.
7.1
Environmental Checklist
Condition
Ambient temperature
Ambient humidity
Shelter from sunlight
Shelter from precipi-
tation
Air circulation
Dust level
Anti-vandalism measures
Tab. 5:
Environmental checklist
7.2
Infrastructure Checklist
Condition
Input Wiring & Termi-
nals
Key and cabinet door
lock
Fixing screws
No fuse breaker (NFB)
Residual current device
(RCD)
Input electricity capacity
Input electricity config-
uration
Grounding resistance
Grounding system
Input voltage & fre-
quency
Optional network con-
nections & quality
Tab. 6:
Infrastructure checklist
|
SP0 150 2139
VER.00
Status
Notes
Recommended
but not required
Recommended
but not required
Status
Notes
Type/Length/
Cross Section
Type/quantity
NFB current rat-
ing must be great-
er than 50mA
Maximum RCD
residual cur-
rent must not
be greater than
30mA
Wye
<50Ω
3G/4G
8.
Installation
8.1
Cable Holders
Using six M6 screws, fasten each cable
holder to the bottom sides of the charging
unit (see Fig. 4).
Fig. 4:
Orientation of cable holders
"
The cable holders are installed.
i
The open side of the cable holders must
face outwards (see Fig. 4).
8.2
Wall Mounting Bracket
Using four 3/8" expansion screws, attach
the wall-mounting bracket between 2'ft
(600mm) and 4'ft (1.2m) above the floor
(see Fig. 5).
!
Ensure mounting structure is capable of
supporting 176lb (80Kg)
Fig. 5:
Wall mount installation
© Bosch Automotive Service Solutions Inc.

Publicité

Table des Matières
loading

Table des Matières