Tools And Materials; Before You Begin - Kohler K-704310 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Materials

Silicone Sealant
Masking
(required)
Tape
File
Pencil
Drill & 5/16"
Drill Bit

Before You Begin

CAUTION: Risk of injury or product damage. Unframed tempered glass should not contact hard
surfaces or it may shatter. Do not touch the edge of the tempered glass panel with tools or any hard
objects. Do not set unframed tempered glass directly on the floor or any other hard surface.
CAUTION: Risk of injury or product damage. Do not cut tempered glass. It will shatter.
IMPORTANT! This door is designed to accommodate walls that are less than 3/8" (1 cm) out of plumb.
Verify the area the door will be attached to is within 3/8" (1 cm) or better of plumb. The door may not
function properly if the wall is more than 3/8" (1 cm) out of plumb.
The shower bath or receptor should be installed/prepared, including finished wall materials, before
continuing.
Before starting the installation, lay out and identify all of the parts. Inspect them for damage.
Once inspected, return the glass panels to their packaging and place them in a safe area until they
are needed.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
1015440-2-E
Duct Tape Tape
Safety
Measure
Glasses
Level
Miter Saw or Hack Saw with 32
teeth per inch blade
Center
Assorted
Punch
Screwdrivers
2
Plus:
Drop cloth
Claw
Hammer
Miter Box
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-7043120K-704314

Table des Matières