Tools And Materials; Before You Begin - Kohler Sterling 600B Serie Guide D'installation

Portes de douche coulissantes
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Tools and Materials

Masking
Silicone
Tape
Sealant
Center
Punch
File
Assorted
Screwdrivers
Thank You For Choosing Sterling
We appreciate your commitment to Sterling quality. Please take a few minutes to review this manual before
you start installation. If you encounter any installation or performance problems, please don't hesitate to
contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing
Sterling.

Before You Begin

CAUTION: Risk of eye injury. Always wear safety glasses when cutting or drilling.
CAUTION: Risk of injury or product damage. Tempered glass cannot be cut.
IMPORTANT! Pay special attention to the section titled "Very Important Instructions." Failure to follow
the directions could result in product damage.
NOTE: When using a retractable case tape measure, make sure you add the length of the case to the
measurement or measure in a manner that excludes the case.
Lay out and identify the parts. Inspect them for damage.
Return the glass panels to their packaging and place them in a safe area until they are needed.
The bath/shower should be installed at this time, including finished wall materials.
1034038-2-B
Tape
Measure
Drill and
Assorted
Drill Bits
Miter Saw or Hacksaw with
32 Teeth per Inch Blade
Knife
Level
Pencil & Felt
Tip Marker
Claw
Hammer
Safety Glasses
Miter Box
2
Plus:
• Drop Cloth
Caulk Gun
Sterling

Publicité

Table des Matières
loading

Table des Matières