Kohler Sterling 600B Serie Guide D'installation page 6

Portes de douche coulissantes
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Locate the Bottom Track
NOTE: The bottom track must sit flat. If the bath/shower ledge has a curve in the corners or is
constructed of fiberglass, it may be necessary to shape the ends of the track with a file.
Place the bottom track on the flattest part of the bath/shower ledge with the leg toward the outside
of the shower.
Position the bottom track so there is an equal gap between each wall and the ends of the bottom
track.
Temporarily secure the bottom track to the ledge with masking tape.
Mark the ledge along the front edge of the bottom track with a soft pencil.
1034038-2-B
Equal gap at
each end.
Bottom Track
Leg
6
Sterling

Publicité

Table des Matières
loading

Table des Matières