Kohler Sterling 600B Serie Guide D'installation page 8

Portes de douche coulissantes
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Bottom
Track
4. Caulk the Bottom Track
Apply a bead of caulk or sealant in the front groove on the underside of the bottom track.
Apply a second, smaller bead of caulk or sealant to the other edge on the underside of the bottom
track.
Install the bottom track on the ledge at the marked location.
5. Install the Wall Jambs
Place a wall jamb over the bottom track. Align the holes in the wall jamb with the holes in the wall.
NOTE: The middle screw should be inserted through a bumper before being installed. Do not overtighten
the middle screw or damage to the bumper may occur.
Secure the wall jamb to the wall with three #8-18 x 1-1/4" panhead screws.
Repeat the procedures with the other wall jamb.
1034038-2-B
Seal here.
Wall Bumper
(Guiding Lip)
Toward Inside
of Shower
#8-18 x 1-1/4"
Panhead Screw
8
Straight Wall Jamb
Wall
Jamb
Sterling

Publicité

Table des Matières
loading

Table des Matières