Télécharger Imprimer la page

fiac TDRY 6-18 Manuel D'instructions page 43

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 99
Operations to be performed by qualified personnel.
Never operate with plants under pressure.
The user is responsible to ensure that the dryer will never be operated with pressure exceeding
the nominal values.
Eventual over-pressure could be dangerous both for the operator and the machine.
The temperature and the amount of air entering the dryer must comply with the limits reported on the data
plate. In case of treatment of air at particularly high temperatures, the installation of a final refrigerator could
result necessary. The cross section of the connecting piping, which must be free from dust, rust, chips and
other impurities, must be consistent with the flow-rate of the dryer.
In order to facilitate the maintenance operations, we suggest installing a by-pass group, as shown in the
following illustration.
Ø
In realising the dryer, particular measures have been taken in order to limit the vibration which could occur
during the operation.
Therefore we recommend to use connecting pipes able to insulate the dryer from possible vibrations
originating from the line (flexible hoses, vibration damping fittings, etc.).
2.7 CONNECTION TO THE COOLING WATER NETWORK (Water-Cooled)
Operations to be performed by qualified personnel.
Never operate with plants under pressure.
The user is responsible to ensure that the dryer will never be operated with pressure exceeding
the nominal values.
Eventual over-pressure could be dangerous both for the operator and the machine.
The temperature and the amount of cooling water must comply with the limits indicated on the technical
characteristics chart.
The cross section of the connection pipes, preferably flexible, must be free from rust, chips and other
impurities, must be consistent with the flow-rate of the dryer.
2.6 CONNECTION TO THE COMPRESSED AIR SYSTEM
Dryer
Ø [BSP-F]
TDRY 6-18
TDRY 12-18 Silver
TDRY 25
TDRY 36-49
TDRY 63-80
TDRY 105
TDRY 143-168
A [mm]
1/2"
210
1/2"
210
1"
205
1.1/4"
205
1.1/2"
235
2"
345
2.1/2"
410
GB
By-Pass Code
2240GBP021
2240GBP021
2240GBP022
2240GBP023
2240GBP024
2240GBP025
2240GBP026

Publicité

loading