Thermador PROFESSIONAL PRO GRAND PRD364JDGC Instructions D'installation page 23

Masquer les pouces Voir aussi pour PROFESSIONAL PRO GRAND PRD364JDGC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ITEMS INCLUDED
12 – 1'' (25.4 mm)
screws
4 – ½'' (12.7 mm)
screws
4 – U-Nuts
2 – Upper shelf
brackets
4 – Lower shelf
brackets
2 – Racks
1 – Wall Plate
1 – Installation guide & templates
1. Tape the templates included with the Keep Hot Shelf to
the wall accordingly:
Tape the sheet titled Left Hand Template to bottom
and left end of hood. Align the bottom line of hood
with the top line of the template.
Tape the sheet titled Right Hand Template to
bottom and right end of hood. Align the bottom line
of hood with the top line of the template.
Tape the sheet titled Installation Instruction so that
the arrow at the top of the template aligns with
hood centerline. Align the bottom line of the hood
with the top line of the template.
Left to right sides of the template must be equal to
length of shelf.
2. Mount the (2) upper shelf brackets and the (3) lower
shelf brackets on the 30'' & 36'' models or (4) lower
shelf brackets for the 48'' model at the locations
outlined on the templates. Secure with (10) 1''
(25.4 mm) screws provided.
3. Cut template out from around the brackets and remove
from the wall. Do not discard template before the Keep
Hot Shelf is completely installed.
4. Insert U-Nuts onto each of the lower shelf brackets.
5. Install the wall plate by setting the corner notches
(back of wall plate) atop the (2) upper shelf brackets.
Installation Instructions
TOOLS NEEDED
Tape measure
Phillips screwdriver
or drill
Painter's Tape
Sharp knife or
scissors
6. Slide the shelf upwards until the bottom engages with
the lower shelf brackets (Figure 25).
Upper Shelf Brackets x 2
Lower Shelf Brackets x 4
7. Check if the top is properly secured by pulling the top
section of the shelf from the wall.
8. Secure to bottom of shelf with the (4) ½'' (12.7 mm)
screws provided.
Low Backguard Installation
When installing against a combustible surface, a Low
Backguard is required. A THERMADOR Low Backguard
must be purchased separately. See "Installation
Clearances with Low Backguard" beginning on page 7.
When using the Flush Island Trim, THERMADOR
recommends a minimum 12'' (305 mm) rear clearance to a
combustible surface. (See "Installation Clearances"
beginning on page 7.) Clearances from non-combustible
materials are not part of the ANSI Z21.1 scope and are not
certified by CSA. Clearances of less than 12'' (305 mm)
must be approved by the local codes and/or by the local
authority having jurisdiction.
LOW BACK
PARTS INCLUDED
Low Back panel
T-20 Torx stainless screws
T-20 Torx drill point screws
Figure 25: 48'' Back of Wall Plate
TOOLS
NEEDED
T-20 Torx head
screwdriver or
drill
Protective Work
Gloves
English 22

Publicité

Table des Matières
loading

Table des Matières