7.6.2 Checking the PV generator for a ground fault
DANGER
Risk of fatal injury due to electric shock!
Severe injury or death will result if the live connections are touched. When there is sunlight present on the
PV generator, there is DC voltage on the open ends of the DC cables.
Only touch the PV generator cables on the insulation. Do not touch the exposed ends of the cables.
Avoid short circuits.
Do not connect any strings with a ground fault to the device.
NOTE
The threshold value from which the insulation monitor reports an error can be set in the "Parameters"
menu.
Ensure that there is no ground fault
1 Measure the DC voltage between the protective earth (PE) and the positive cable of the PV generator.
2 Measure the DC voltage between the protective earth (PE) and the negative cable of the PV generator.
ð If stable voltages can be measured, there is a ground fault in the DC generator or its wiring. The ratio between
the measured voltages gives an indication as to the location of this fault.
3 Rectify any faults before taking further measurements.
4 Measure the electrical resistance between the protective earth (PE) and the positive cable of the PV generator.
5 Measure the electrical resistance between the protective earth (PE) and the negative cable of the PV generator.
ð In addition, ensure that the PV generator has a total insulation resistance of more than 2.0 MOhm, since the
device will not feed in if the insulation resistance is too low.
6 Rectify any faults before connecting the DC generator.
7.6.3 Recommended standard connection
A
B
1
2
3
n
=
n
n
=
1
2
3
Fig. 14: Recommended standard con-
nection
Possible wiring variants
2 PV generators for each MPP
tracker
Page 20
A
4
1
n
4
n
=
n
1
Fig. 15: Parallel input with Y-adapter,
short-circuits the unused MPP Tracker
B
1 PV generator for one tracker. The second
tracker is deactivated
B
2
3
4
...
=
n
2
m
Fig. 16: One generator parallel on both
MPP trackers
1 PV generator parallel on both MPP
trackers
KACO blueplanet 15.0 TL3 KACO blueplanet 20.0 TL3
A
B
1
2
3
4
...
n
=
n
=
n
1
2
m

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Blueplanet 20.0 tl3

Table des Matières