Woods BATWING BW15.50E Manuel De L'opérateur page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1. Crossbar puller clevis
2. 5/8 NC x 4-1/2 HHCS
3. 5/8 NC Hex nut
4. Crossbar puller pad
5. Crossbar puller tube
6. Crossbar puller screw
7. Crossbar puller link
Figure 16.
CROSSBAR INSTALLATION
1.
Using emery cloth (220 or finer), remove surface rust, Loctite
foreign material from hub, splined gearbox vertical shaft, and crossbar
assembly.
2.
Slide crossbar assembly (10) onto splined shaft. Install washer (71) and
nut (72) and align a slot with hole in splined shaft. Torque nut to 610 Nm
(450 lbs-ft).
3.
Install cotter pin (73) through slot in nut and bend ends over.
MAN1246 (12/14/2017)
Crossbar Removal
®
10. Crossbar assembly
71. Washer, 31 mm (1.22) x 56 mm (2.205) x 6 mm (.236)
72. Castle nut, M30 x 2.0P
73. Cotter pin, 6.35 mm x 57 mm (1/4 x 2-1/4)
Figure 17.
UNIVERSAL JOINT REPAIR
1. Yoke
2. Cup and bearings
3. Snap ring
4. Journal cross
Figure 18
U-Joint Disassembly
1.
Remove external snap rings from yokes in four locations as shown in
Figure 19.
and
2.
With snap rings removed, support drive in vise, hold yoke in hand and tap
on yoke to drive cup up out of yoke. See Figure 20.
Dealer Service 21
Crossbar Assembly Installation
. U-Joint Exploded View
Figure 19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Batwing bw15.50qeBatwing bw10.50eBatwing bw10.50qe

Table des Matières