Dri-Eaz LGR 7000XLi Guide D'utilisation page 15

Masquer les pouces Voir aussi pour LGR 7000XLi:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Reassembling pump and back cover
Reinstall pump. Slide pump and pump bracket back into
place.
Ensure that the two holes in the bracket, the rotomolded
housing and the pump basin are properly aligned before
inserting and starting the bolts by hand.
3
Reinstall the two
in. bolts securing the pump mounting
8
bracket. Do not overtighten.
Reinstall drain hose on to pump outlet.
Tip back cover into place. Ensure that the sealing strips are
properly aligned and free of kinks.
Replace four bolts on the lower half of the back cover. Leave bolts snug but not tight. Now place the unit on its
back.
NOTICE: Be sure housing bolts are properly threaded before tightening. Do not overtighten. Do not use a power
tool!
3
Reinstall five bottom plate
in. bolts.
8
Now set the unit upright and tighten the four back cover bolts.
Reinstall the top cover. See "Reinstalling the Heat Block and Top Cover" beginning on p. 10.
TIP: Tighten cover bolts in increments from the bottom upward to create the best seal. As you tighten, check for proper
alignment and ensure that all seals are in place and free of kinks.
The unit is now ready for use.
07-01776D (F412 120V) 2013-01 Warranty 07-00420
15
Dri-Eaz Products, Inc.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

F412

Table des Matières