5
Commissioning
Before switching on
5
Commissioning
Before switching on
(
Stop!
Before switching on the standard device with the function module in the
LECOM−B network for the first time
check the complete wiring for completeness, short circuit, and earth fault.
ƒ
check whether the bus system is terminated physically at the first and last
ƒ
station by the integrated active bus terminating resistor.(^ 43)
42
l
EDK82ZAFLC−010 DE/EN/FR 4.0