Equipment Connections - Eaton Evolution Pulsar Serie Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour Evolution Pulsar Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
2. Installation

2.6 Equipment connections

Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source
and the true electrical consumption of the total load.
Fit the connection securing system. (rack model only).
Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (10) is not
pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
34008235EN/AC - Page 12
1 - Disconnect the supply cable
supplied) of the equipment.
2 - Connect the cable to socket (2), then to
the AC-power source.
3 - Connect the loads to the UPS using the
cables (17).
It is preferable to connect the priority loads
to the two outlets marked (3) and the non-
priority loads to the two programmable
outlets marked (5) (1 and 2).
To program shutdown of outlets (5) during
24
operation on battery power and thus
optimise the available backup time, the
EATON communication software is
required.
(1) Cable characteristics: 250 V - 10 A (CSA
2
1mm
, type HO5).
17
4 - Fit the connection securing system (23)
17
that prevents the plugs from being pulled
out accidentally.
23
(1)
(not

Publicité

Table des Matières
loading

Table des Matières