Installation For 9Px 8K Sp And 9Px 10K Sp; Inspecting The Equipment; Unpacking The Cabinet - Eaton 9PX8KSP Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Installation for 9PX 8K SP and 9PX 10K SP

3.1

Inspecting the equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials
for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage:
1. File with the carrier within 15 days of receipt of the equipment;
2. Send a copy of the damage claim within 15 days to your service representative.
Check the battery recharge date on the shipping carton label. If the date has passed and the
batteries were never recharged, do not use the UPS. Contact your service representative.
3.2

Unpacking the cabinet

• Unpacking the cabinet in a low-temperature environment may cause condensation to occur in and
on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are absolutely
dry (hazard of electric shock).
• The cabinet is heavy (see "Weights and dimensions" on page 43). Follow Special precautions
provided on page 4 and on the carton.
Unpack the equipment and remove all the packing materials and shipping carton.
Note: Do not lift the UPS from the front panel.
Unpacking UPS.
Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity, flammable gas, and
corrosion.
Packing materials must be disposed of in compliance with all local regulations concerning waste.
Recycling symbols are printed on the packing materials to facilitate sorting.
Page 10
614-00205-01_EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

9px10ksp9pxebm360sp

Table des Matières