RAIS 900 Manuel D'utilisation page 41

Masquer les pouces Voir aussi pour 900:
Table des Matières

Publicité

English
RAIS - manual for RAIS 900
It is important that there are no leakage between the flue pipe and the stove. It is re-
commended to seal the connection by suitable gasket or compound.
Install the insulated flue pipe and connect to chimney.
Install fresh air inlet connection to the pipe stub if such is to be installed (if chosen).
If pipes are intended installed on the outlets of the convection system this is recommen-
ded before building further.
The stove is now ready for building into either panels or brick wall.
After establishing the wall and eventually painted, the fronts and covers are mounted
again. Remove all protective plastic and tape.
It is possible to deliver front panels in special measures if needed together with the stove.
Contact your local RAIS dealer.
NOTE!!
Please note that if airsystem mounted under the stove increases the total height
eg. Flex hose
37

Publicité

Table des Matières
loading

Table des Matières