GE Zoneline AZ95E Mode D'emploi page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the Zoneline
6. Level and Secure Drain Platform
directions.
Rigid
Ductwork
Rigid Ductwork
7. Connect the Top Ductwork
to the rigid ductwork above the unit.
outlet. Use a field supplied clamp to secure the duct to
the air discharge outlet.
Rigid
Ductwork
Rigid Ductwork
Air
Discharge
Outlet
Air
Discharge
Outlet
8. Connect the Remote Thermostat
connections should be made to any circuit in the thermostat.
Follow the instructions included with the thermostat to
connect the thermostat to the unit.
Thermostat
Connection to the Unit
AWG – American Wire Gauge
Use only Class 2 wiring
2. Plug the thermostat connector into the control board.
Thermostat Connector
7
6 5 4 3 2 1
R
GL
GH
B
Y
W
C
49-5000561 Rev. 1

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zoneline az95h

Table des Matières