GE Zoneline AZ95E Mode D'emploi page 19

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the Zoneline
4. Complete Condensate Drain
Connections
the primary drain connector. A secondary drain is
supplied if required by state and local codes. Refer
to the local codes for proper installation of the drains.
Drain Overview
Secondary Drain
Primary Drain
Internal Drain (Primary)
Run condensate line to
building interior drain
line with proper venting
according to local
building codes.
49-5000561 Rev. 1
Drain line connection
to right of platform
4. Complete Condensate Drain
Connections (cont)
External Drain (Secondary)
secondary drain line though
the plenum and grille.
Use a pipe connector and
additional piping to ensure
outdoor grille.
Primary
Drain
Refer to drain platform instruction
manual for drain installation
5. Install Unit to Plenum
Align the unit with plenum opening and slide unit
toward plenum to ensure it is seated properly with the
drain platform.
Wall
Plenum
Drain
Platform
drain pipe into plenum
or through outdoor
grille. Grille must be
modified to allow drain
line to pass through.
Unit

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zoneline az95h

Table des Matières