Dremel 3D45 Traduction De La Notice Originale page 25

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 72
GLUE APPLICATION INSTRUCTIONS
It is important to ensure that the 3D45 build platform is
covered with Dremel specified glue before each build.
A properly maintained glue layer helps parts adhere to
the build plate during prints and prevents warping and
curling, especially in large prints.
You should apply a layer of glue every 1-3 prints.
When you apply glue, make sure you apply it to the
whole area of the bed where the part will print. Make
sure that the build plate is cool before removing it or
applying glue.
Each time you apply glue, make sure to apply two
overlapping layers. You can apply the glue to the
perimeter of the print area first (1), and then zigzag
up and down while overlapping over the entire area
(2). Wait for 10 seconds and then apply another layer
zigzagging left to right (3). This ensures a uniform layer
over the entire build area.
Allow the glue to dry before leveling or starting a print.
Preheating the build plate can help speed up this
process.
2
Every 7-10 glue applications, or if the glue layer
becomes uneven, you should completely clean the
build platform. You can do this in one of two ways:
Option 1: Remove the build platform from the printer.
Wet the platform in water, by holding it under warm
water for a few seconds. Make sure not to get the
warning label on the front of the build plate wet. After
that, you should easily be able to scrape or wipe the
glue off. Make sure the build platform is completely dry
before putting it back in the 3D45.
Option 2: Remove the build platform from the printer.
Use the scraper to scrape the glue off the entire
surface of the build plate. You can scrape from left to
right and then from up to down to ensure that all the
glue has been removed. Make sure to remove the build
platform from the printer before scraping as glue dust
can get sucked into the filter and clog it.
Apply two full layers of glue to the clean build plate
allowing the first layer to dry in-between.
Once the second layer has dried, re-level the platform
before starting your next print.
25
3
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3d45-01

Table des Matières