saro SVM Manuel D'utilisation page 48

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEDIENUNGSANLEITUNG/ USER MANUAL/ MANUEL D'UTILISATION
Saro
SEAL SYSTEM MAINTENANCE
The following seal systems are available for the SVM:
DOUBLE SEAL
CUT-OFFSEAL
1 x 3,5 mm seal
2 x 3,5 mm seal
1 x 1,1 mm cut
single time setting
The seal quality is partially dependent on the maintenance of the sealing bar and silicone holder. The main maintenance
activities are the daily cleaning of the sealing bar and silicone holder with a damp cloth and a weekly inspection of the
bars with replacement of the sealing wire, Teflon tape or silicone rubber if irregularities appear on top of the bar or the
seal quality is insufficient.
The sealing bar is clicked onto the seal cylinder shafts and can be removed by lifting the seal bar vertical from the
mentioned shafts.
The steps for replacing the sealing wire and Teflon tape are described on the following pages.
The average maintenance cycle of the sealing bar (Teflon tape / sealing wire) is at least once every 4 months.
(This indication refers to regular use of the machine and packaging standard products with standard vacuum packaging materials. No rights can be
derived from this indication)
Version 12.10 Art. 0894552
48

Publicité

Table des Matières
loading

Produits Connexes pour saro SVM

Table des Matières