Vacuum Pump Maintenance - saro SVM Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEDIENUNGSANLEITUNG/ USER MANUAL/ MANUEL D'UTILISATION
STANDARD MAINTENANCE SCHEDULE FOR THE MACHINE
Daily
Weekly
Every Six Months
Yearly
Four-yearly

VACUUM PUMP MAINTENANCE

It is very important to regularly service the pump to ensure extended and correct operation. The following activities are
essential for correct maintenance. If the machine is used regularly then it is advisable to have the pump fully inspected at
least once a year by the supplier to ensure extended and problem free operation. Contact the supplier or SARO for
more advice and information.
Conditioning program
The conditioning program ensures that the pump is thoroughly rinsed. During the programme the pump and oil reaches
operating temperature so that the oil can better absorb any moisture and contaminants and filter them. The high
temperature enables any moisture in the pump to evaporate minimising the risk for corrosion in the pump.
The program lasts 15 minutes and it is advisable to run it at least once a week. Turn on the machine, press the key
[conditioning program], and close the lid. The program runs automatically. During the program the display will display
moving dots.
The program can be interrupted at any time using the [STOP] key. It is however important for the sake of good
maintenance that the program completes a full 15 minute cycle and therefore advisable only to interrupt the cycle for
something urgent.
It is also advisable to run the program before using the machine for the first time, after the machine has been stationary
for a lengthy period of time, and especially prior to changing oil.
Version 12.10 Art. 0894552
Clean the vacuum chamber, lid and housing after use with a damp cloth.
Be careful that no cleaning agents containing solvents are used.
Make sure that no high pressure cleaner is used.
Check the oil level and replace or top up oil if the oil is turbid or the oil level is too low.
For instructions, see page 46.
Activate the conditioning program for the pump at least once a week.
Check the seal beam for damage. Replace Teflon tape/seal wire if the seal quality is
no longer sufficient or if the Teflon tape/seal wire is no longer taught on the bar. For
instructions, see page 49-50.
Check the lid gasket and replace it if the gasket is damaged or stretched. For
instructions, see page 51.
Inspect the transparent lid for cracks. If cracks are visible, turn off the machine
immediately and contact the supplier or SARO .
Replace oil at least once every 6 months.
Inspect the oil exhaust filter for saturation. If saturated, replace the filter. For
instructions, see page 47.
Contact the supplier for a professional service
Replace transparent lid and the gas springs
Replace seal cylinder membranes.
Saro
45

Publicité

Table des Matières
loading

Produits Connexes pour saro SVM

Table des Matières