1) GENERAL OUTLINE
Motor-driven header for automatic sliding doors with one leaf (mod. VISTA SL
1) or two (mod. VISTA SL 2).
Complete with control panel. Accessories available for producing a complete
installation.
For VISTA SL1 models the door will be delivered with the actual door opening
PU on the left (looking at the door from the inside)(Fig. AI).
2) TECHNICAL SPECIFICATIONS
MECHANICAL SPECIFICATIONS
VISTA SL1 mod. doorway opening min 750mm max 2500mm
VISTA SL2 mod. doorway opening min 800mm max 2900mm
Single-leaf capacity load
Double-leaf capacity load
Protection rating
Crosspiece dimensions

ELECTRICAL SPECIFICATIONS

Power supply
Power input
Fuses
Accessories power supply
Power supply V SAFE
Alarm output and door status
Opening/closing speed
Approach speed
Temperature range
Operating cycle
Emergency batteries
Radio-receiver built-in
Rolling-Code
Max. n° of remotes that
can be memorized
Usable transmitter versions:
All ROLLING CODE transmitters compatible with
3) PREPARING THE ELECTRICAL SYSTEM
Prepare the electrical system (fig. A), referring to the standards in force. Keep
mains power connections well separated from service connections (photocells,
safety edges, control devices, etc.).
Keep mains power connections well separated from safety extra low voltage
connections. Secure the power cable by means of the cable clamp located in
the transformer's cover. Connect the power cable so that the earth wire (yellow/
green) is longer than the other wires.
4) IDENTIFICATION OF COMPONENTS (Fig. AA)
In the standard composition, the automated VISTA SL system is made up of:
1 Load-bearing header in oxidized aluminium
2 Power supply unit complete with bipolar switch, mains fuse and noise filter
3 Microprocessor-based control unit ARIA - EVO
4 DC gearbox
5 Optical encoder for detecting travel and checking for obstacles
6 Driven pulley
7 Drive belt
8 2 Door runners with 2 wheels on bearings, anti-derailment wheel, height and
depth adjustable
11 Rubber hinge
12 Cable raceway
The following accessories are available to complete installation:
9/10 PRV AA SL
Leaf fastening profile
13 WMP
Wall mount profile
14 BBV
Battery-powered panic device
15 ERV
Electromagnetic bolt and manual release
16 VISTA SEL
Digital function pushbutton unit (optional extra)
17 SBV
Supporting beam in oxidized aluminium
18 PGI
Bottom door guide profile for framed doors
19 PPR
Slide for bottom door guide
20 RIP
Automatic sliding door safety and opening sensor
22
- VISTA-SL (ARIA-EVO)
INSTALLATION MANUAL
mod. VISTA SL1 150 kg
mod. VISTA SL2 120+120 kg
IP X0 (Not for installation outdoors)
See Fig. D
230V- 220V~ ±10%, 50Hz single-phase
120V~ ±15% 50/60Hz
Rated: 160W
Maximum: 800 W
see Fig. Q
31,5 VDC max 500mA
24V max 30mA
Contact max 24V 0,5A
Adjustable up to 1 m/s (VISTA SL1)
Adjustable up to 2 m/s (VISTA SL2)
In the range 5 to 10 cm/s in automatic
mode (VISTA SL1)
In the range 10 to 20cm/s in automatic
mode (VISTA SL2)
-20°C (no condensation) + 50°C (inside cover)
Continuous at 25°C
(optional extras) 2 x 12V 1.2Ah
Frequency 433.92 MHz
63
21 FPA1
Photocells (1 amplifier, 1 transmitter, 1 receiver)
21 FPA2
Photocells (1 amplifier, 2 transmitters, 2 receivers)
22 CRTV
Cover
23 SASAM1-2
Breakout door device.
24 PRV 20.A21
Hallway strip fastening plate
27 PRV 20.A22
Wall strip fastening plate
25 PRV 20.110
Strip for PRV 20 Fig. AD
26 PRV 40.130
Strip for PRV 40 Fig. AD
PPA
Clamp for glass doors (Fig. AE).
PPA SL-SLC
Clamp for glass doors (Fig. AE).
5) FASTENING METHOD
- Assembling the Cover (Fig. B).
- Cable routing (Fig. C).
WARNING- When fastening the header, only use flat countersunk screws
as shown in Fig. I Rif. 1 or screws with heads no more than 5 mm high. If
this condition is not met, collisions may occur with the runners.
6) DETERMINING HEADER FASTENING HEIGHT (Fig. E)
The fastening height HFT of the VISTA SL header must be measured where the floor
is at its highest (Fig. E). This is to prevent the possibility of the moving door leaf
getting stuck once installation is finished. Once installed, the height of the doors
can still be adjusted by means of the special adjusters on the runners (Fig. L).
WARNING: The VISTA SL header must be fastened so that it is perfectly
horizontal. This condition must be met to ensure that the automated system
operates properly.
6.1) Fastening to wall (above an opening) (Fig. F - G)
6.2) Mounting between two walls (inside door opening space) (Fig. H)
To position the header symmetrically with respect to the doorway opening, no
matter what kind of installation you are dealing with (above an opening, inside
an opening, etc.), you need to mark both the centre line of the structural opening
and centre line of the VISTA SL header. Fasten the VISTA SL header, lining up the
two marks (Fig. H).
7) POSSIBLE INSTALLATIONS
A number of installation methods for the automated system are listed below:
-
Wall mounted.
-
Ceiling mounted (with supporting beam SBV).
-
Incorporated in door frame (with or without supporting beam SBV, PRV 20.11,
PRV 40.13 ).
7.1) Wall mounting (Fig. I)
A "support profile" (WMP) is also available to help with wall mounting (Fig. I).
It is best to attach shims in line with the fastening holes already made in the
header. That way, the fastening points will sit on a solid base and you will avoid
the track bending while screws are being fastened. In the event fastening holes
have to be drilled in addition to those already made, drill them approx. every
600-800 mm: this will also depend on what kind of surface you are dealing with
(concrete, brick, wood, iron, etc.).
7.2) Ceiling mounting (with supporting beam SBV Fig. AB - AC)
This type of installation is particularly suitable if the door leaf and fixed panel are
made from frameless glass, and hence are not load-bearing.
7.3) Incorporated in door frame (with or without supporting beam Fig. AD-AB1)
The supporting beam is incorporated in a load-bearing door frame or a flat profile
is built into the frame that must be thick enough to fasten the VISTA SL header
securely. If the supporting beam SBV is used, it will be easier to fasten the VISTA
SL header with the screws and plates provided. If the support beam PRV 20.11
or PRV 40.13 is used, self-perforating screws are recommended.
8) DOOR ASSEMBLY AND ADJUSTMENT
8.1) Framed doors
Before removing the door leaf mounting profile in order to fasten it to the actual
leaf, it is advisable to mark the position where the runners are fastened to the
door leaf mounting profile (Fig. AI - AJ). This will make final adjustment of the
door leaves' travel limit brackets and centring of the ERV easier. If the top rail of
the framed door leaf is less than 6-7mm thick and the leaf is heavy (>120Kg), it
must be reinforced inside with an iron profile or plate into which the door leaf
mounting profile can be screwed at various points.
8.2) Glass doors (Fig. AE)
For further details, see "pliers instruction sheet"
The clamping system PPA/PPA SL-SL C can be used only for 10 or 12mm (PPA)
/ 8-10-12-13,5mm (PPA SL-SL C) -thick tempered glass doors or laminated
safety glass doors.
It must not be used with double glazing. For the sake of simplicity, reference is
made to glass doors from hereon in.
- No holes must be made in the sheet of glass (PPA)
- The glass sheet must be perforated (PPA SL-SL C).
- Clamp PPA must be fastened to the door mounting profile as illustrated in Fig.
AE.
- Seals G, of a suitable thickness, must be placed on both sides of the sheet of
glass, between the clamp and glass. Use only seals provided for this purpose.