Final Assembly - Vetus BOW6012D Manuel D'utilisation Et Instructions D'installation

Masquer les pouces Voir aussi pour BOW6012D:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
4 .3

Final assembly

• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
1
2
The propeller should run a minimum of 1 .5 mm (
thrust tube wall, all round .
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock­screw (C).
• Grease the input shaft with an installation compound, like 'Mo­
lykote® G­n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo­
tor.
vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D
Outboard Gear
Grease
3
1
/
") free of the
16
4
M5
3 Nm
Outboard Gear
M8
12 - 15 Nm
(9 - 11 ft.lbf )
Molykote® G-n plus
ENGLISH
5
PH2
2.5
(2.2 ft.lbf )
Grease
6
13
020547.04

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bow6024d

Table des Matières