Final Assembly - Vetus BOW PRO Série Instructions D'installation

Masquer les pouces Voir aussi pour BOW PRO Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
4 .3

Final assembly

• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
The propeller should run a minimum of 1 .5 mm (
thrust tube wall, around the complete circumference .
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock-screw (C) to the specified torque.
• Grease the input shaft with an installation compound, such as
'Molykote® G-n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand - it should turn easily,
while connected to the output spindle of the electric motor.
vetus® Installation instructions BOW PRO Series Thruster: BOWA0301
1
/
") free of the
16
ENGLISH
Outboard Gear
Grease
M6
5 - 6 Nm
(3.7 - 4.4 ft.lbf )
M5
3 Nm
(2.2 ft.lbf )
Outboard Gear
Grease
17
M10
20 - 25 Nm
(15 - 18 ft.lbf )
Molykote® G-n plus
5
2.5
27
020802.01

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bowa0301

Table des Matières