Vetus BOW PRO Série Instructions D'installation page 22

Masquer les pouces Voir aussi pour BOW PRO Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
3
Installation recommendations
3 .1
Positioning of the thruster tunnel
Several installation examples.
To achieve the optimum performance, po-
sition the thruster tunnel as far forward as
possible.
If, in addition to controlling the movement
of the bow, the stern of the vessel is required
to move sideways, then a second thruster
may be installed at the stern.
For a planing boat the tunnel should, if pos-
sible, be so situated so that when the vessel
is planing it is above the water level thus
causing no resistance.
Installation of two bow thrusters in tandem
(for larger boats). In this case, depending on
weather conditions, one or both bow thrust-
ers may be used.
When choosing the location for the thrust
tunnel, take the following into account for
optimum performance:
- The distance A shown in the drawing
must be at least 0.5 x D (where D is the
tunnel diameter).
- The length of the tunnel (distance B)
should be between 2 x D and 4 x D.
22
020805.01
A
D
A
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0572
Set-up: 2 bow thrusters in a catamaran
t
:
ip
We do not advise fitting 2 bow thrusters
into one tunnel; this does not result in
doubling the thrust!
D = 150 mm (5
A = 75 mm (3")
B = 300...600 mm
D
(12...24")
=
=
B
7
/
")
8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bowa0572

Table des Matières